← Back to the course on SkillUp Space  ·  Print / PDF
Online course · SkillUp Space

Detailed Production Planning with Claude Projects

From an empty database to a working planner for your plant
10live online sessions of 1 hour
9 Novemberstart · every Monday
15:00–16:00 (Sofia time)
Recordingsof every session
EUR 500per participant · final price

Why this course

In many plants real planning does not happen in the ERP but in Excel — by hand, by work centre instead of by machine, and redone after every change. The ERP gives an order a date without being able to explain why. The course shows how a planner builds a Claude Project that calculates the schedule with code, explains every decision and recalculates in minutes — using rules the plant understands and can change itself.

Who it is for

  • Planners and production managers
  • Operations directors
  • Owners of manufacturing companies

No programming needed — the rules are written in plain language and Claude turns them into code.

What you leave with

  • A Claude Project with the data, algorithm and rules of your plant (or of a training plant)
  • A readable planning algorithm and simulation templates
  • A daily re-planning procedure and a policy register
How it works. Every week — 1 hour live with Vladislav Velikov and a practical task until the next session. A missed session is caught up with the recording. Key principle: calculations are done with code (code execution), not “in the head” — the planner sees and controls the rules.
EUR 500
per participant · final price
Includes the 10 sessions, the recordings, working files and templates. Invoice and bank transfer; the seat is reserved after payment.
Reserve my seat →
Register through the form · questions: office@cybilas.com
Lecturer: Vladislav Velikov — engineer and consultant, practitioner of TRIZ, Lean and the Theory of Constraints.
CYBILAS Ltd. (СИБИЛАС ЕООД) · UIC 208819078 · 19 Kavala St., Varna 9000, Bulgaria · office@cybilas.com · +359 887 461 147 · skill-up.space
This is a private training by CYBILAS Ltd.; the programme may be refined before the start.
Programme · 10 sessions · every Monday 15:00–16:00 from 9 November

What we do in each session

1

Why standard planning fails + the plant database

We look at the ERP as a “black box” and at real planning in Excel. Claude Projects basics: instructions, knowledge, conversations; calculations done with code. We collect the minimum dataset — machines, products, routings, calendars, shifts.

Output: first version of the database
2

Data validation

Typical errors: missing routings, zero times, duplicates, due dates in the past. Claude proposes, the human confirms — the schedule is calculated only after confirmation.

Output: a checklist inside the project instructions
3

The planning algorithm

The plant’s logic becomes written rules: priorities, bottlenecks, buffers, transfer batches (basis: TOC / Drum-Buffer-Rope, Lean). A first weekly schedule by machine; every decision is explainable.

Output: the algorithm in plain language and in code
4

“What if” simulations

A second shift, an urgent order, a broken machine, more people at a manual station. Answering “when will the new order be ready and which orders does it displace”, comparing scenarios.

Output: a scenario comparison template
5

Execution and re-planning

Every day the plan is compared with execution: where the data comes from (ERP, manual, QR/mobile), working with incomplete data, a new schedule for the morning meeting, metrics (buffer penetration, late orders).

Output: a daily re-planning procedure
6

Skills matrix and absences

Who can work on which operation and at what level; the impact of absences, substitution rules, spotting a “single point of failure”.

Output: a skills matrix and response rules
7

Rules for different production types

Serial, one-off, make-to-order, continuous, mixed: how buffers, batches and priorities change; different rules for different departments; planning “learns” from execution data.

Output: a library of rules by production type
8

Transfer time, blanks and assembly

Fixed and distance- or batch-dependent transfer time; transfer batch versus full batch. Bill of materials (BOM), synchronising branches to assembly, stocked blanks versus make-to-order.

Output: an extended routing model and a multi-level structure
9

Internal policies with immediate effect

Minimum batch size, protected orders, customer priority, shift constraints, frozen horizon. A rule is changed in a conversation and applies from the next calculation; traceability of who changed it, when and why.

Output: a policy register
10

Final and roll-out in a real plant

A realistic roll-out timeline, security and confidentiality of plant data, when a local solution is needed. Defending it to management: hours saved, late orders, transparency. Participants present their projects.

Output: a roll-out plan and the management pitch
Each session is about 1 hour and includes a practical task until the next one. The programme follows the material of Vladislav Velikov; the sequence may be adjusted before the start.
CYBILAS Ltd. · office@cybilas.com · +359 887 461 147 · skill-up.space
Registration: the form on the course page. Price EUR 500 per participant — final price.